Folder B82F10
     Container 
  
Contains 1 Result:
Gail Hamp Staff Engineer Phase IV and V electrical contracts, energy projects DFCM alternatives for volt line, highlights of HVAC Congress, library drain, installation ultra-sonic motion detector in Business Building, and tunnel heat at PE Building, April 1986, July 1988-June 1989
     File  — Folder: B82F10
  
    
      Identifier: Folder B82F10
    
      Scope and Contents
        From the Series:
        
    This series contains correspondence, records, reports, minutes, and other materials acquired during the tenure of President Nadauld.
        Dates: 
      April 1986, July 1988-June 1989