Skip to main content

Gail Hamp Staff Engineer Phase IV and V electrical contracts, energy projects DFCM alternatives for volt line, highlights of HVAC Congress, library drain, installation ultra-sonic motion detector in Business Building, and tunnel heat at PE Building, April 1986, July 1988-June 1989

 File — Folder: B82F10
Identifier: Folder B82F10

Scope and Contents

From the Series:

This series contains correspondence, records, reports, minutes, and other materials acquired during the tenure of President Nadauld.

Dates

  • Creation: April 1986, July 1988-June 1989

Creator

Conditions Governing Access

The collection is open for research use.

Extent

From the Collection: 42 Linear Feet (85 document cases, 3 RC boxes)

Language of Materials

From the Collection: English

Repository Details

Part of the Weber State University Archives Repository

Contact:
3921 Central Campus Drive Dept 2901
Ogden UT 84408