Gail Hamp Staff Engineer Phase IV and V electrical contracts, energy projects DFCM alternatives for volt line, highlights of HVAC Congress, library drain, installation ultra-sonic motion detector in Business Building, and tunnel heat at PE Building, April 1986, July 1988-June 1989
File — Folder: B82F10
Identifier: Folder B82F10
Scope and Contents
From the Series:
This series contains correspondence, records, reports, minutes, and other materials acquired during the tenure of President Nadauld.
Dates
- Creation: April 1986, July 1988-June 1989
Creator
- From the Collection: Nadauld, Stephen D. (Person)
Conditions Governing Access
The collection is open for research use.
Extent
From the Collection: 42 Linear Feet (85 document cases, 3 RC boxes)
Language of Materials
From the Collection: English
Repository Details
Part of the Weber State University Archives Repository